{"id":849,"date":"2017-02-02T16:21:18","date_gmt":"2017-02-02T21:21:18","guid":{"rendered":"http:\/\/cjseng.com\/SSE\/?page_id=849"},"modified":"2017-02-02T16:22:53","modified_gmt":"2017-02-02T21:22:53","slug":"constructed-cost-estimates","status":"publish","type":"page","link":"https:\/\/cjseng.com\/SSE\/constructed-cost-estimates.html","title":{"rendered":"Constructed Cost Estimates"},"content":{"rendered":"<table border=\"0\" width=\"100%\">\n<tbody>\n<tr valign=\"top\">\n<td colspan=\"2\"><span style=\"color: #0033cc; font-size: x-large;\"><strong><span style=\"font-family: Trebuchet MS;\">SCHNEIDER STRUCTURAL ENGINEERING<\/span><\/strong><\/span><span style=\"color: #0033cc; font-family: Trebuchet MS; font-size: x-large;\">\u00a0\u00a0<\/span><span style=\"color: #0062ad; font-family: Trebuchet MS; font-size: x-large;\">\u00a0\u00a0<\/span><\/p>\n<p align=\"center\"><span style=\"color: #0033cc; font-family: Trebuchet MS; font-size: large;\">Constructed Cost Estimates <\/span><\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<tr valign=\"top\">\n<td style=\"width: 50%; height: 333px; vertical-align: top;\" width=\"308\" height=\"333\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Schneider Structural Engineering, Inc. is regularly asked to provide to constructed cost estimates.\u00a0 These estimates use the traditional published constructed cost reference manuals published by <a href=\"http:\/\/www.rsmeans.com\">Means<\/a> and <a href=\"http:\/\/www.costdataonline.com\/\">Richardsons<\/a>.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">These references are always tempered and modified by our experience with construction costs and construction labor.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Our experience is continually updated by our large percentage of design projects that our design build. <\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Schneider Structural Engineering, Inc. is regularly asked to to be a partner in a design <\/span><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">build<\/span><\/td>\n<td style=\"width: 50%; vertical-align: top;\" width=\"322\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">team because of our reputation of understanding construction costs and the ramification of the construction details that we select on the costs of the constructed project.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">We do not hesitate to validate our constructed cost estimates with contractor input on actual costs. Contractor feedback provides continuous pricing education and updating on our pricing routines and procedures.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Schneider Structural Engineering, Inc. is an engineering firm and can not guarantee final contractor pricing. <\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SCHNEIDER STRUCTURAL ENGINEERING\u00a0\u00a0\u00a0\u00a0 Constructed Cost Estimates Schneider Structural Engineering, Inc. is regularly asked to provide to constructed cost estimates.\u00a0 These estimates use the traditional published constructed cost reference manuals published by Means and Richardsons. These references are always tempered and modified by our experience with construction costs and construction labor. Our experience is continually updated [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/849"}],"collection":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/comments?post=849"}],"version-history":[{"count":3,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/849\/revisions"}],"predecessor-version":[{"id":853,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/849\/revisions\/853"}],"wp:attachment":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/media?parent=849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}