{"id":968,"date":"2017-02-03T15:57:33","date_gmt":"2017-02-03T20:57:33","guid":{"rendered":"http:\/\/cjseng.com\/SSE\/?page_id=968"},"modified":"2017-02-13T17:21:37","modified_gmt":"2017-02-13T22:21:37","slug":"project-phases","status":"publish","type":"page","link":"https:\/\/cjseng.com\/SSE\/project-phases.html","title":{"rendered":"Project Phases"},"content":{"rendered":"<table border=\"0\" width=\"100%\">\n<tbody>\n<tr valign=\"top\">\n<td>\n<h1>SCHNEIDER STRUCTURAL ENGINEERING<\/h1>\n<h2 align=\"center\">Description of Project Phases<\/h2>\n<hr \/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"2\" cellpadding=\"2\">\n<tbody>\n<tr valign=\"top\">\n<td style=\"width: 50%; height: 333px;\" width=\"308\" height=\"333\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Design projects are often separated and identified by phases.\u00a0 The common phase terminology used is <a href=\"http:\/\/cjseng.com\/SSE\/schematic-design-phase.html\">Schematic Design(SD)<\/a>, <a href=\"http:\/\/cjseng.com\/SSE\/design-development-phase.html\">Design Development(DD)<\/a>, and <a href=\"http:\/\/cjseng.com\/SSE\/construction-administration-phase.html\" target=\"_top\">Construction Administration(CA).<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/schematic-design-phase.html\">Schematic Design<\/a> is the initial phase of a design project.\u00a0The project closely defined in this phase of the project.\u00a0 The owner and the lead professional define the requirements of the structure and the facility.\u00a0 The size and configuration along with the finish requirements are usually defined in this initial Schematic Design phase.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">In some circumstances the owner may wish to have the project and facility <a href=\"http:\/\/cjseng.com\/SSE\/constructed-cost-estimates.html\">constructed costs estimated<\/a>.\u00a0 With the Schematic Design phase completed an estimated constructed cost estimate can be prepared. Changes can be made at this initial stage to correct project costs to maintain the budget and financing available. <\/span><\/p>\n<p>&nbsp;<\/td>\n<td style=\"width: 50%;\" width=\"322\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/design-development-phase.html\" target=\"_top\">Design Development(DD)<\/a> phase that the design, calculations, specifications and drawings are created.\u00a0 The information obtained in the Schematic Design phase is used as a map to generate the final design documents. <\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/construction-administration-phase.html\" target=\"_top\">Construction Administration(CA)<\/a> phase provides engineering oversight on the construction and quality assurance of the constructed project. <\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/construction-administration-phase.html\" target=\"_top\">Construction Administration(CA)<\/a> includes the jurisdictional code required special inspections. Special Inspections is a duty of the <a href=\"http:\/\/cjseng.com\/SSE\/structural-engineer-of-record-ser.html\">Structural Engineer of Record(SER)<\/a> and has become an essential requirement to obtaining the final occupancy permit. <\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/cjseng.com\/SSE\/service.html\" target=\"_top\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Return to Description of Services<\/span> <\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SCHNEIDER STRUCTURAL ENGINEERING Description of Project Phases Design projects are often separated and identified by phases.\u00a0 The common phase terminology used is Schematic Design(SD), Design Development(DD), and Construction Administration(CA). &nbsp; Schematic Design is the initial phase of a design project.\u00a0The project closely defined in this phase of the project.\u00a0 The owner and the lead professional [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/968"}],"collection":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/comments?post=968"}],"version-history":[{"count":6,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/968\/revisions"}],"predecessor-version":[{"id":1507,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/968\/revisions\/1507"}],"wp:attachment":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/media?parent=968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}