{"id":990,"date":"2017-02-03T17:14:07","date_gmt":"2017-02-03T22:14:07","guid":{"rendered":"http:\/\/cjseng.com\/SSE\/?page_id=990"},"modified":"2017-02-15T14:26:04","modified_gmt":"2017-02-15T19:26:04","slug":"schematic-design-phase","status":"publish","type":"page","link":"https:\/\/cjseng.com\/SSE\/schematic-design-phase.html","title":{"rendered":"Schematic Design Phase"},"content":{"rendered":"<table border=\"0\" width=\"100%\">\n<tbody>\n<tr valign=\"top\">\n<td>\n<h1>SSE OMAHA<\/h1>\n<h2 align=\"center\">Schematic Design Phase<\/h2>\n<hr \/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"0\" width=\"100%\" cellspacing=\"2\" cellpadding=\"2\">\n<tbody>\n<tr valign=\"top\">\n<td style=\"width: 50%; height: 333px;\" width=\"308\" height=\"333\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Schematic Design is the initial phase of a design project.\u00a0The project closely defined in this phase of the project.\u00a0 The owner and the lead professional define the requirements of the structure and the facility.\u00a0 The size and configuration along with the finish requirements are usually defined in this initial Schematic Design phase.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">In an industrial facility operating temperatures, equipment requirements, sanitary requirements, lighting and many other basic requirements are defined by the owner and the lead professional.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">The successful completion of the Schematic Design phase provides all of the information required to complete the Design Development phase of the design project.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/td>\n<td style=\"width: 50%;\" width=\"322\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">The schematic Design phase is essential to a successful and timely project.\u00a0 Without complete and thorough project definition there is an increasing potential for design delays and extra costs due to a lack of good information resulting in inefficient design processes. <\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Schneider Structural Engineering, Inc. has a great deal of successful experience as the <a href=\"http:\/\/cjseng.com\/SSE\/sse-engineer-of-record.html\">Engineer of Record<\/a> and providing Schematic Design Services.\u00a0 The success of these projects is directly attributed to the thorough Schematic Design Services that provided a complete roadmap for the design and construction services that followed. <\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/project-phases.html\" target=\"_top\">Return to Project Phases<\/a><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table border=\"5\" width=\"100%\" cellspacing=\"2\" cellpadding=\"2\" bgcolor=\"#CCCCCC\">\n<tbody>\n<tr valign=\"top\">\n<td style=\"width: 50%;\" width=\"295\"><span style=\"font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/\"><span style=\"font-family: Arial,Helvetica,sans-serif;\">Return to SSE Home Page <\/span><\/a><\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/sseinfo.html\">SSE Main Information Page <\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/project-experience.html\"><span style=\"font-family: Arial,Helvetica,sans-serif;\">SSE Projects <\/span><\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/e-mail-and-ftp-access.html\"><span style=\"font-family: Arial,Helvetica,sans-serif;\">SSE Download and E-Mail <\/span><\/a><\/span><\/td>\n<td style=\"width: 50%;\" width=\"307\"><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/whatisastructuralengineer.html\">What is a Structural Engineer ? <\/a><\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/service.html\">SSE Services Description<\/a><\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/projects-experience-index.html\">SSE Projects indexed by Services<\/a><\/span><\/p>\n<p><a href=\"http:\/\/cjseng.com\/SSE\/experience-indexed-by-keywords.html\"><span style=\"font-family: Arial,Helvetica,sans-serif;\"><u><span style=\"font-size: small;\">SSE Project Keyword Hierarchy Tree <\/span><\/u><\/span><\/a><\/p>\n<p><span style=\"font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/licensemap.html\"><span style=\"font-family: Arial,Helvetica,sans-serif;\">SSE Licenses <\/span><\/a><\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>SSE OMAHA Schematic Design Phase Schematic Design is the initial phase of a design project.\u00a0The project closely defined in this phase of the project.\u00a0 The owner and the lead professional define the requirements of the structure and the facility.\u00a0 The size and configuration along with the finish requirements are usually defined in this initial Schematic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/990"}],"collection":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/comments?post=990"}],"version-history":[{"count":5,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/990\/revisions"}],"predecessor-version":[{"id":1681,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/pages\/990\/revisions\/1681"}],"wp:attachment":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/media?parent=990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}