{"id":1313,"date":"2017-02-11T17:41:00","date_gmt":"2017-02-11T22:41:00","guid":{"rendered":"http:\/\/cjseng.com\/SSE\/?p=1313"},"modified":"2017-02-16T17:54:14","modified_gmt":"2017-02-16T22:54:14","slug":"fourth-street-parking-garage-restoration","status":"publish","type":"post","link":"https:\/\/cjseng.com\/SSE\/fourth-street-parking-garage-restoration\/","title":{"rendered":"Fourth Street Parking Garage Restoration"},"content":{"rendered":"<table border=\"0\" width=\"100%\" cellspacing=\"1\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td class=\"textCel1\" style=\"width: 50%; vertical-align: top;\" valign=\"top\" width=\"298\">\n<h5>FOURTH STREET PARKING GARAGE<\/h5>\n<h5>RESTORATION &amp; REHABILITATION,<\/h5>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Council Bluffs, IA <\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Owner: City of Council Bluffs, IA<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Structural Engineer: SSE<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Architect: Mark Wozniak &amp; Associates <\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"http:\/\/cjseng.com\/SSE\/fourth-street-parking-project-information.html\" target=\"_top\"><span style=\"font-family: Arial,Helvetica,sans-serif;\">Additional Project Information <\/span><\/a><\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">Initially condemned and recommended to be demolished by the consultant to the city, the Fourth Street Parking Garage was successfully restored only due to SSE expertise in the restoration or deteriorated concrete structures.<\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">The Parking Garage was originally constructed of cast in place concrete on the lower levels, precast prestressed concrete on the second level, and post tensioned concrete on the third level.\u00a0 The second and third levels were originally supported by a structural steel rigid frame. <\/span><\/p>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif; font-size: small;\">The repairs by SSE were optimized to provide the maximum economies to the repairs, and to guarantee twenty plus years of additional service for the initially condemned structure. <\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-518\" src=\"http:\/\/cjseng.com\/SSE\/wp-content\/uploads\/3_000.jpg\" alt=\"\" width=\"448\" height=\"270\" srcset=\"https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/3_000.jpg 448w, https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/3_000-149x90.jpg 149w\" sizes=\"(max-width: 448px) 100vw, 448px\" \/><\/p>\n<p><span style=\"color: #999999; font-family: Arial,Helvetica,sans-serif; font-size: xx-small;\">Keywords: Restoration, Rehabilitation, Repairs, Retrofit, Concrete, Steel, Parking Garage<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/td>\n<td class=\"textCel2\" style=\"width: 50%; vertical-align: top;\" valign=\"top\" width=\"355\">\n<h5><\/h5>\n<h5><\/h5>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h5><\/h5>\n<h5>\u00a0\u00a0<img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-516\" src=\"http:\/\/cjseng.com\/SSE\/wp-content\/uploads\/1_002.jpg\" alt=\"\" width=\"391\" height=\"336\" srcset=\"https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/1_002.jpg 391w, https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/1_002-105x90.jpg 105w\" sizes=\"(max-width: 391px) 100vw, 391px\" \/><\/h5>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-full wp-image-517\" src=\"http:\/\/cjseng.com\/SSE\/wp-content\/uploads\/2_000.jpg\" alt=\"\" width=\"414\" height=\"336\" srcset=\"https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/2_000.jpg 414w, https:\/\/cjseng.com\/SSE\/wp-content\/uploads\/2_000-111x90.jpg 111w\" sizes=\"(max-width: 414px) 100vw, 414px\" \/><\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>FOURTH STREET PARKING GARAGE RESTORATION &amp; REHABILITATION, Council Bluffs, IA Owner: City of Council Bluffs, IA Structural Engineer: SSE Architect: Mark Wozniak &amp; Associates Additional Project Information Initially condemned and recommended to be demolished by the consultant to the city, the Fourth Street Parking Garage was successfully restored only due to SSE expertise in the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[129,147,150],"tags":[],"_links":{"self":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/posts\/1313"}],"collection":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/comments?post=1313"}],"version-history":[{"count":3,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/posts\/1313\/revisions"}],"predecessor-version":[{"id":1547,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/posts\/1313\/revisions\/1547"}],"wp:attachment":[{"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/media?parent=1313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/categories?post=1313"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cjseng.com\/SSE\/wp-json\/wp\/v2\/tags?post=1313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}