PROJECT INFORMATION

PROJECT:

CONSTRUCTED COST:

PROJECT TYPE:

PROJECT METHOD:

Notre Dame Debartelo Performing Arts Center

$63.6 Million

Higher Education

DESIGN BID


CONSTRUCTION MANAGEMENT CONTRACTOR:

ARCHITECT:

OWNER:

MASONRY CONTRACTOR:

ARCHITECTURAL PRECAST SUPPLIER:

PRECAST CONNECTION DESIGNER:

Turner Construction Company

Pfeiffer Partners, Inc.

University of Notre Dame

Gough, Inc.

Sun Precast Company

SCHNEIDER STRUCTURAL ENGINEERING INC.


Project Description:   Schneider Structural Engineering provided the Structural Engineering for the Exterior Architectural Precast Panel attachments to the main superstructure of the 150,000 square foot building.  The Architectural Precast mimics the existing Gothic Architecture of the University of Notre Dame.   

Keywords: Architectural, Steel, GFRC Glass Fiber Reinforced Concrete, Observation-Inspection-Investigation.

 

Back to Project Title Listing

Web Page Author: Paul M. Douglas P.E., S.E.