FOURTH STREET PARKING GARAGE
RESTORATION & REHABILITATION,

Council Bluffs, IA

Owner: City of Council Bluffs, IA

Structural Engineer: SSE

Architect: Mark Wozniak & Associates

Additional Project Information

Initially condemned and recommended to be demolished by the consultant to the city, the Fourth Street Parking Garage was successfully restored only due to SSE expertise in the restoration or deteriorated concrete structures.

The Parking Garage was originally constructed of cast in place concrete on the lower levels, precast prestressed concrete on the second level, and post tensioned concrete on the third level.  The second and third levels were originally supported by a structural steel rigid frame.

The repairs by SSE were optimized to provide the maximum economies to the repairs, and to guarantee twenty plus years of additional service for the initially condemned structure.

Keywords: Restoration, Rehabilitation, Repairs, Retrofit, Concrete, Steel, Parking Garage

 

 

 

 

 

  

 

 

Fabric Covered Arched Structures

Client: Sioux Steel Company

 

Additional Project Information

Back to Project Title Listing

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Keywords: Load Ratings, Load CapacityAnalysis, Forensic Engineering, Problem Solving, Commercial, lCast-in-place concrete, Steel, Wood-Timber-Lumber, Foundations

   

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

Photo Courtesy of Sioux Steel Company

 

 

Web Page Author:  Paul M. Douglas P.E., S.E.

 

21,000 sq.ft. CMU RASAJA Office Building
Midwest Construction Services
La Vista, NE

Contractor: K&K Masonry, Inc

Architect: Torson Robert Architects, Omaha, NE 68114

Designed by: Ratul D. Sarmah

 

This 21,000 sq.ft. attractive CMU building is characterized by 26-ft clear wall opening for windows on 3 sides. Large steel lintels off pilasters spaced at 30-ft., supported the CMU above windows. CMU walls were designed to span horizontally between pilasters by the use of DUR-O-Wal Truss Double Extra Heavy truss reinforcement.

 

Special slip-joint at steel lintel bearing which coincided with wall vertical control joint to control cracking were the special design feature of the project.

 

Keywords: Masonry, CMU-Concrete Block, Commercial, Architectural, Office, Steel, Foundations,

 

Theme Park, Kansas City, MO
Structural Design & Detailing

Design Build: Larson Themed Construction

 

Model & images by : Larsen Construction Co., MO

Keywords: Concrete, Steel

 

 

 

 

      

 

 

Finite Element Analysis & Design

Prefabricated Modular Wall & Roof Panel

Pedersen Power Products

 

 

Keywords: Finite Element Analysis, Modular, Panel, Steel

 

 

 

 

 

Notre Dame Debartelo Performing Arts Center

South Bend, Indiana

Additional Project Information

Back to Project Title Listing

Above Photo courtesy of Sun Precast Company

 

Keywords:  Architectural, Steel, GFRC Glass Fiber Reinforced Concrete, Observation-Inspection-Investigation.

Web Page Author: Paul M. Douglas P.E., S.E.

Retrofit Existing Roof for new Drift
K.P.R. Holdings, LP

Waterloo, IA

 

Keywords: Retrofit, Drift, Double-Tee, Analysis, Design, Concrete